What does SP2 Infrastructure zoning mean?
That the land is set aside for the infrastructure purpose written on the LEP's Land Zoning Map, such as a classified road, railway, school, hospital or utility. The Standard Instrument permits that purpose and anything ordinarily incidental to it with consent, and prohibits nothing else expressly, leaving the LEP to fill the table.
Can I build a house on SP2 land?
Not under the Standard Instrument's SP2 entry, which permits only the mapped purpose and ancillary development. A dwelling would need to be added by the council's LEP or permitted by another instrument. Where an existing house sits on land reserved for a road, existing use rights and the acquisition provisions in clause 5.1 of the LEP are the relevant questions.
My lot is R2 with a strip of SP2 along the front. What does that mean?
The strip is usually reserved for road widening or another public purpose, and the LEP's Land Reservation Acquisition Map and clause 5.1 will say which authority can be required to acquire it. Development on the R2 part follows the R2 rules; the strip cannot be counted towards site area if the proposed development is prohibited on it (clause 4.5(4) of the Standard Instrument).
Who has to buy SP2 land?
Clause 5.1 of the LEP names the relevant acquisition authority for land shown on the Land Reservation Acquisition Map. An owner can require that authority to acquire the land under the Land Acquisition (Just Terms Compensation) Act 1991. Not all SP2 land is on that map, so check it for the site.